When construction designs get complex, clashes get obvious; and with that reworks, cost overruns, and delayed schedules are inevitable. Design stakeholders, architects, design engineers and contractors are much bothered by these clashes, be it hard clash or soft clash or workflow clashes which result in the highest ruckus on site. How do these clashes occur and what is the efficient way to resolve them?