You are seeing the paginated version of the page.
It was specially created to help search engines like Google to build the proper search index.

Click to load the full version of the page
Conflicts between Drawings and BIM Models; Contractor’s Plight | Hitech
BIM is a digital representation of projects from concept design to construction across operations. Used mainly for designing, pricing, programming, coordinating, integrating, and sequencing work activities, it also helps in MEP clash detection between items of work. BIM though used on a project, hard copy drawings still will be used by the design team. Difficulties are bound to happen if there are inconsistencies between the 3D, 4D, or 5D BIM models, and the hard copy drawings. The drawings may show different dimensions, as compared to the layouts and configurations of the BIM models. So why not check out some of the contractual considerations, while using BIM on future projects.
Original link
Scan to BIM Conversion for Heritage Monument Building, UK | Hitech CADD Services
Gain complete digitized documents for heritage structure renovation by converting scanned data into highly efficient 3D BIM models. Hitech CADD Services’ BIM experts deploy virtual construction models for accurate geometry and precise designs for your Point Cloud to BIM modeling needs.
Original link
Important Tips to Consider When Implementing 4D BIM for Construction Scheduling
A truly efficient and strategic approach to 4D BIM proves to be a game-changer in construction scheduling. By adding “time” as the fourth dimension to 3D BIM models, 4D BIM enhances simulation that reduces inconsistencies for stakeholders. By intelligently interlinking different project components, the tool facilitates a logical and efficient sequencing of processes, thereby speeding the delivery and optimizing costs. Here we discuss the most crucial tips to consider when implementing 4D BIM for construction scheduling.
Original link
Advantages of 5D BIM to Cost Managers | Hitech
Have you faced the inability to develop an accurate and consistent cost estimation template using 2D cost estimation methods? Many cost managers are adopting 5D BIM to drive faster BOQs and leveraging reduced project timelines, greater flexibility, and higher control over cost estimates and budget in the volatile construction industry.
Original link
How BIM services address complex hospital construction needs
Infrastructural, operational, and safety risks act as barriers in solving complex healthcare construction needs. Explore how the adoption of BIM in hospital construction helps architects, designers, and contractors.
Original link
How to Convert Point Cloud Data into Revit Models
Is your renovation or restoration project not meeting the necessary timelines or budget? Renovation and retrofit projects need Point Cloud to BIM processes and tools for precise cost estimates, streamlined schedules and material estimation. Watch this video on how Point Cloud data can be converted to coordinated and clash-free models using Revit to achieve successful renovation, restoration and retrofitting.
Original link
How 5D BIM facilitate efficient construction process
Refine budgets through interactive estimates at the preconstruction stage with 5D cost estimation. Hitech CADD Services assists builders and contractors with improved cost visualization to reduce project lifecycles, minimize material costs and exhibit better project control.
Original link
Revit Family Creation for Plumbing Equipment Manufacturer, USA
Revit drafters at Hitech CADD Services created Revit families of plumbing equipment for a North American company. With the 150 Revit Families created, we facilitated the client to gain quick modeling through readily available BIM data that was used with architectural and structural drawings, resulting in time savings for the client. Check full project. Our BIM modeling experts help you to complete your construction project on-time & within budget, email us your BIM requirements at info@hitechcaddservices.com

Original link
Real time clash detection using coordinated BIM models
Rework and material waste contribute to about 35% of construction cost. This is a huge hit to the construction project owners as it depletes their profit margin. Clash detection tools like Navisworks can identify and resolve clashes with coordinated 3D BIM models. Be it interdisciplinary clashes, component buffer space clashes or workflow clashes, clash detection tools can easily resolve them in the pre-construction stage, thus reducing rework and material wastage. To know more on the types of clashes and how to resolve them click here: https://bit.ly/30UVusy To avail our clash detection services: https://bit.ly/3luCZo4
Original link
A 5 Step Guide to Create As-Built Models for Heritage Structures from Point Clouds
Point cloud to BIM modeling is truly a game-changer for the construction industry. Creating 2D/3D As-Built models from Point Clouds enables better decision making, reduced rework and risks, lower costs, high-quality deliverables, and more for any restoration and renovation projects. Here you will find a 5 step process to create 2D/3D as-built models for heritage buildings.
Original link